Kaiser Pond Diversion Pipe Improvement

Kaiser Pond Diversion Pipe Improvement Project

 

This groundwater recharge pond is divided by a levee along the Hayward Fault, which also divides the groundwater basin in two.  The diversion pipe that allows water to flow from the east segment of the pond to the west is need of replacement.  ACWD will construct a reinforced concrete box culvert through the levee to improve connectivity between the two segments.

 

Location:

In the City of Fremont, adjacent to the Alameda Creek Flood Control Channel in the vicinity of Von Euw Common and the Union Pacific Railroad tracks.

MAP

 

Status:

Design of the Kaiser Pond Diversion Pipe Improvement Project is currently in progress.  The CEQA Initial Study/Mitigated Negative Declaration (IS/MND) public comment period is closed as of July 11, 2018.  The public review draft may be reviewed at the link below.  The ACWD Board of Directors will hear the motion to adopt the final IS/MND on August 9, 2018.

CEQA Initial Study/Mitigated Negative Declaration

 

 

Project Information:

 Anticipated Construction: Summer 2019

Project Manager: Carlos Sempere

Email: Carlos Sempere

Phone: (510) 668-4484